Power Seraya

The aim of the project was to conduct extension work of real time metering system.

Singtel Data Centre

This project is focused on carrying out data centre fit-out works for SingTel DC West at Level 6 Hall 11. EcoXplore is to supply, deliver, install, terminate, conduct software configuration, test and commission 1-lot of “EMRS System” including space sensor / Dew Point Sensor System at the above-mentioned site.

Public Utilities Board (PUB)

  • The aim of the project was to supply and install a gateway for Power Monitoring System at Changi Water Reclamation Plant.
  • To service and maintain the Power Monitoring System at Changi Water Reclamation Plant.

Sentosa Development Corporation

  • EcoXplore conducted engineering and programming work for Sentosa without UPS (Variation Order for Additional GSM Modem & Programming ). Specifically, EcoXplore aided in HMI development, PLC programming, reporting and paging as well as testing and commissioning.
  • Conducted engineering and programming work for Sentosa without UPS. Specifically, EcoXplore aided in HMI development, PLC programming, reporting and paging as well as testing and commissioning.

PAP Community Foundation HQ

Provision of maintenance of information, communication and technology devices for PCF Community Foundation LCCC, located at Marsiling Mega 2.

Maintenance will be conducted on a half-yearly basis for a period of two years, with the option to extend till 2022.

Johnson Controls (S) Pte Ltd

EcoXplore supplied, delivered and installed Power Monitoring System/Devices LT Switch Room & Air Con Switch Room (with meter kiosk) at URA Centre BMS Replacement,

Infineon Technologies

EcoXplore helped conduct engineering works, software configuration and programming. Furthermore, they installed a Power Monitoring System, configured servers, developed HMI and programmed meters communication to HMI and Database.

Singapore General Hospital

  • EcoXplore supplied, installed and configured Power Monitoring Device and System for National Cancer Centre.
  • EcoXplore supplied and installed Power Monitoring & Logging System and provided Necessary Report (Using Class A PQube Data Analyser).

Alexandra Hospital

The aim of the project was to supply, install and configure Power Monitoring and Logging System complete with Necessary Report (Using Class A PQube Data Analyser)

James Cook University

EcoXplore supplied, delivered, installed, tested and commissioned a power monitoring system at James Cook University.

SIT@TP Building

EcoXplore supplied, delivered, installed, tested and commissioned an Energy Monitoring and Control System (EMS) at SIT@TP Building

Mediacorp Pte Ltd.

EcoXplore has been assigned to conduct UPS Work for Studio 1 & 2, non-comprehensive maintenance of Power Monitoring & Control System (PMCS) at Mediacorp Campus for period of two years (01st Feb 2018 to 31st Jan 2020).

Marina Bay Sands (MBS)

EcoXplore is carrying out effective preventive maintenance servicing for Power Management and Control System in accordance with MBS maintenance requirements and as per the original manufacturer’s recommendations. This will help ensure operational functionality, reliability and readiness of the equipment.